THORON
(HONG KONG)
LIMITED 科諾
Unithene PE Membrane
Polyethylene waterproofing membrane
Unithene PE Membrane is fabricated from recycle thermoplastic polyethylene into tough and dense sheet which can be used as a waterproofing membrane.
-
For prevention of permeability of water, soil layer separations prior to landfills, below primed concrete surfaces.
-
Particularly suitable for installation in road works, evaporation ponds, canals, reservoirs, water treatment plants, landfill sites and lakes.
Standard thickness: 0.08mm, 0.125mm, 0.25mm, 0.3mm, 0.5mm and 1.1mm
Country of origin: China
List of project references: -
-
Airport Authority Hong Kong (AAHK) Contract No. 3310 - H.K. Int’l Airport - Three Runway System Project - North Runway Modification Works
-
AAHK Contract No. 3408 - H.K. Int’l Airport - Three Runway System Project - Third Runway Concourse & Apron Works
-
AAHK Contract No. 3802 - H.K. Int’l Airport - Three Runway System Project - APM & BHS Tunnels & Related Works
-
Transitional Housing Project at Ngau Tam Mei, Yuen Long for Evangelical Lutheran Church Social Service-Hong Kong
-
Architectural Services Department (ArchSD) Contract No. SS J510 - Provision of Columbarium, Garden of Remembrance & Related Works at On Hing Lane, Shek Mun
-
Water Supplies Department (WSD) Contract No. 2/WSD/20 - Uprating of Sheung Wong Yi Au Fresh Water Supply System - Stage 2 - Construction of Sheung Wong Yi Au No. 3 Fresh Water Service Reservoir
-
WSD Contract No. 7/WSD/21 - Construction of Siu Ho Wan Water Treatment Works Extension & Siu Ho Wan Raw Water Booster Pumping Station
-
Hong Kong Housing Authority (HKHA) Contract No. 20229085 - Civil Engineering Improvement Works at Tsui Ping (South) Estate & Chak On Estate
-
HKHA Contract No. 20170567 - Construction of Public Housing Development at Hiu Ming Street (Combined Recreational Facilities Reprovision, Site Formation, Foundation & Building Contract)
-
Agriculture, Fisheries & Conservation Department (AFCD) Contract No. R1/23-24 - Reconstruction of Tai Shing Stream Section (Phase III) of Shing Mun Forest Track, Shing Mun Country Park
-
AFCD Contract No. R1/22-23 - Reconstruction of Tai Shing Stream Section (Phase II) of Shing Mun Forest Track, Shing Mun Country Park
-
ArchSD Contract No. SS D510 - Relocation of Supporting Operational Facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club & other Fire Services Accommodations at To Wah Road, Kowloon
-
HKHA Contract No. 20190169 - Construction of Public Housing Development at Tai Po Area 9, Tai Po
-
ArchSD Contract No. SS K525 - Construction of Town Park in Area 68, Tseung Kwan O
-
Civil Engineering & Development Department (CEDD) Contract No. NL/2020/04 - Tung Chung New Town Extension - Siu Ho Wan Fresh Water Service Reservoir & Associated Mainlaying Works
-
WSD Contract No. 3/WSD/18 - Water Supply to New Housing Developments in Sheung Shui & Fanling - Construction of Tong Hang No. 3 Fresh Water Service Reservoir & Associated Mainlaying
-
Drainage Services Department (DSD) Contract No. DC/2020/01 - Upgrading of West Kowloon & Tsuen Wan Sewerage - Phase 2C
-
CEDD Contract No. NL/2020/02 - Tung Chung New Town Extension - Salt Water Supply System
-
AFCD Contract No. R1/21-22 - Reconstruction of Tai Shing Stream Section of Shing Mun Forest Track, Shing Mun Country Park
-
AAHK Contract No. 3303 - Three Runway System Project - Third Runway & Associated Works
-
ArchSD Contract No. TC G973 - Term Contract for the Design & Construction of Minor Works to Government & Subvented Properties for which the ArchSD is Responsible in Contract Area of New Territories & Outlying Islands (North)
-
DSD Contract No. DC/2019/06 - Drainage Improvement Works in Northern New Territories (Remaining Works), Southern H.K. Island & Ngong Ping
-
HKHA Contract No. 20199463 - Civil Engineering Improvement Works at Butterfly Estate
-
Second Expansion of DHL Central Asia Hub at 6 South Perimeter Road, H.K. Int’l Airport, Chek Lap Kok
-
CEDD Contract No. ND/2019/07 - Fanling North New Development Area, Phase 1: Site Formation & Infrastructure Works
-
CEDD Contract No. NE/2016/01 - Site Formation & Infrastructure Works for Development of Anderson Road Quarry Site
-
DSD Contract No. DC/2018/05 - Relocation of Sha Tin Sewage Treatment Works to Caverns - Site Preparation & Access Tunnel Construction
-
AAHK Contract No. 3403 - Three Runway System Project - New Integrated Airport Centres - Building & Civil Works
-
AFCD Contract No. R1/20-21 - Reconstruction of Ho Pui Reservoir Section (Phase II) of Tai Lam Forest Track, Tai Lam Country Park
-
HKHA Contract No. 20170100 - Construction of Subsidised Sale Flats Development at Hang Kin Street, Ma On Shan Area 90B
-
HKHA Contract No. 20160309 - Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phase 11
-
Subsidised Sale Flats Project at Tuen Mun Area 2, TMTL 545, J/O Shek Pai Tau Road & Ming Kum Road, Tuen Mun (Terrace Concerto) for Hong Kong Housing Society (HKHS)
-
Site A & Estate Road of MTR Wong Chuk Hang Station Property Development by Road King & Ping An
-
ArchSD Contract No. SS E501 - Design & Construction of Transport Department's Vehicle Examination Centre at Sai Tso Wan Road, Tsing Yi
-
CEDD Contract No. NL/2017/01 - Infrastructure Works for Public Housing Development at Area 54, Tung Chung
-
House Development at 4 Kent Road, Kowloon Tong
-
AFCD Contract No. R1/18-19 - Reconstruction of Track & Pavement Improvement Works at Tai Po Kau Nature Reserve
-
MTR Contract No. C3840-13C: Tsim Sha Tsui Station Carnarvon Road Subway and Entrances Modification Works
-
Contract No. CC/2015/3A/022 - Main Works Contract for M+ Museum Project for the West Kowloon Cultural District Authority
-
HKHA Contract No. 20150592 - Foundation, Site Formation, Road & Drainage for Public Rental Housing Development at Queen's Hill Site 1, Fanling - Phases 1, 2 & 5
-
DSD Contract No. DC/2013/04 - Outlying Islands Sewerage, Stage 2 - Lamma Village Sewerage Phase 2, Package 1
-
CEDD Contract No. IS/2015/02 - Improvement Works at Mui Wo, Phase 2 Stage 1
-
CED Contract No. NE/2015/02 - Tseung Kwan O-Lam Tin Tunnel - Road P2 & Associated Works
-
HyD Contract No. HY/2013/03 - H.K.-Zhuhai-Macao Bridge H.K. Boundary Crossing Facilities - Vehicle Clearance Plazas & Ancillary Buildings & Facilities
-
Office Complex at NKIL 6312, Lam Lee Street, Kowloon Bay (Kingston International Centre) for Swire
-
MTR West Rail Nam Cheong Station Property Development (Cullinan West) by Sun Hung Kai Properties (SHKP)
-
HyD Contract No. HY/2014/13 - Construction of Access Road joining She Shan Road, Tai Po & Improvement of Nam Wai Road, Sai Kung
-
AAHK Contract No. M788-5 - H.K. Int’l Airport - Construction of Temporary Parking Area for Business Jets
-
CEDD Contract No. KL/2011/02 - Infrastructure Works for Housing Sites adjacent to Lung Ping Road at Tai Wo Ping
-
Central Police Station Conservation & Revitalisation Project
-
Residential Development at KIL 11227, J/O Sheung Lok Street & Sheung Shing Street, Homantin (Mantin Heights) by Kerry Properties
-
CEDD Contract No. CV/2013/08 - Liantang/Heung Yuen Wai BCP Site Formation & Infrastructure Works - Contract 6
-
CEDD Contract No. HK/2012/08 - Wan Chai Development Phase II - Central-Wan Chai Bypass at Wan Chai West
-
AAHK Contract No. P533 - H.K. Int’l Airport - Midfield Concourse & Terminal Building
-
CEDD Contract No. HK/2009/02 - Wan Chai Development Phase II - Central-Wan Chai Bypass at Wan Chai East
-
Junction Improvement Work at Wan Po Road/Wan O Road for Residential Development at TKOTL 70, Area 86, Site AB (Package 2) for Cheung Kong
-
WSD Contract No. 4/WSD/11 - Construction of Butterfly Valley Fresh Water Primary Service Reservoir Extension & Associated Mainlaying
-
Home Affairs Department (HAD) Contract No. DMW/YL/03/2011(10-12) - Construction of Soccer Pitch at Ha Tsuen, Yuen Long
-
MTR Shatin to Central Link Contract No. 1108: Kai Tak Station & Associated Tunnels
-
DSD Contract No. DC/2011/04 - Reconstruction, Improvement & Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate
-
Hong Kong Disneyland Resort Project GC-19 - Back of House Administration Building (TD2) - Enabling Works
-
MTR West Island Line Contract No. 704: Sai Ying Pun & Hong Kong University Station, & Sai Ying Pun to Kennedy Town Tunnel Construction
-
HyD Contract No. HY/2010/05 - Upgrading of Tai Kong Po Access Road, Pat Heung, Yuen Long & Proposed Footpath across Nullah near J/O Ngau Pei Sha Street & Kwong Sin Street, Shatin
-
WSD Contract No. 6/WSD/11 - Construction of Water Supply System to Housing Development at Anderson Road
-
Residential Development at TCTL 37, Area 55B, Tung Chung (The Visionary) by Nan Fung & Poly Property
-
MTR Express Rail Link Contract No. 803A: West Kowloon Terminus Diaphragm Walls (Site A)
-
WSD Contract No. 20/WSD/08 - Replacement & Rehabilitation of Water Mains, Stage 3 - Mains on Hong Kong Island East
-
Environmental Protection Department (EPD) Contract No. EP/SP/58/08 - Design, Build & Operate Sludge Treatment Facilities
-
ArchSD Contract No. SS T303 - Construction of a Primary School at Wylie Road, Ho Man Tin
-
WSD Contract No. 18/WSD/08 - Replacement & Rehabilitation of Water Mains, Stage 3 - Mains on Hong Kong Island South & Outlying Islands
-
DSD Contract No. DC/2007/19 - Drainage Improvement in Northern Hong Kong Island - Western Lower Catchment Works
-
DSD Contract No. DC/2005/12 - Drainage Improvement in East Kowloon - Package B
-
Contract No. CDA12/01 - Development at YLTL 504 in CDA 12, Yuen Long - Site Formation & Road Works for SHKP
-
ArchSD Contract No. SS S315 - Construction of District Open Space at Po Kong Village Road, Wong Tai Sin
-
DSD Contract No. DC/2006/04 - Drainage Improvement in Tuen Mun & Sham Tseng - Package B
-
EPD Contract No. EP/SP/52/06 - Development of EcoPark in Tuen Mun Area 38
-
AAHK Contract No. P333 - H.K. Int’l Airport - North Satellite Concourse
-
Master Redevelopment Project of Ocean Park Contract No. CS-01 - Back of House for Marine Mammal Veterinary Hospital
-
CEDD Contract No. GE/2005/33 - 10-year Extended Landslip Preventive. Measures Project, Phase 4, Package G -. Landslip Preventive Works for Slopes in Shatin
-
Contract No. 511/03 - Carcass Work Contract for Superstructure Works - Phase 7 at Planning Area 19, TCTL 5 MTRC Tung Chung Station Development - Package 3 (Caribbean Coast Phase V - La Mer) for MTRC, Cheung Kong & Hutchison Whampoa
-
Main Contract for Construction of the Hong Kong Business Aviation Centre Hanger 2
-
WSD Contract No. 2/WSD/05 - Water Supply to Sha Tin Development Area 56A – Construction of Kau To High Level Fresh Water Service Reservoir & Kau To Fresh Water Pumping Station
-
...etc.