THORON
(HONG KONG)
LIMITED 科諾
THK Bond Breaker Tape
THK Bond Breaker Tape is polyethylene film tape with adhesives on one side. It serves to prevent adhesion of the sealant to the back of the joint; in other words, it prevents three-sided adhesion and let sealant adhere only to the sides of a joint.
-
Size:
-
20mm x 25m roll
-
25mm x 25m roll
-
9mm x 25m roll
-
12mm x 25m roll
-
-
Country of origin: China
THK Bond Breaker Tape is fully compatible with Arbokol AG2 and X-Seal FR200.
List of job reference in Hong Kong: -
-
Hong Kong Housing Authority (HKHA) Contract No. 20190169 - Construction of Public Housing Development at Tai Po Area 9, Tai Po
-
Civil Engineering & Development Department (CEDD) Contract No. YL/2022/01 - Site Formation & Infrastructure Works for Yuen Long South First Phase Development - Contact 3
-
HKHA Contract No. 20200312 - Construction of Public Housing Development at Hin Fat Lane, Tuen Mun
-
Water Supplies Department (WSD) Contract No. 2/WSD/20 - Uprating of Sheung Wong Yi Au Fresh Water Supply System - Stage 2 - Construction of Sheung Wong Yi Au No. 3 Fresh Water Service Reservoir
-
Agriculture, Fisheries & Conservation Department (AFCD) Contract No. R1/23-24 - Reconstruction of Tai Shing Stream Section (Phase III) of Shing Mun Forest Track, Shing Mun Country Park
-
Architectural Services Department (ArchSD) Contract No. SS J504 - Construction of Water Supplies Department Headquarters & Correctional Services Department Headquarters Building in Chai Wan
-
Highways Department (HyD) Contract No. HY/2019/14 - New Wang Tong River Bridge
-
CEDD Contract No. ED/2018/04 - Trunk Road T2 & Infrastructure Works for Developments at the Former South Apron
-
Drainage Services Department (DSD) Contract No. DC/2020/01 - Upgrading of West Kowloon & Tsuen Wan Sewerage - Phase 2C
-
HKHA Contract No. 20190587 - Construction of Public Housing Development at Fanling Area 36 Phase 4 & Alteration & Addition Works at Existing Ching Ho Estate
-
HKHA Contract No. 20190141 - Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phase 10
-
AFCD Contract No. R1/22-23 - Reconstruction of Tai Shing Stream Section (Phase II) of Shing Mun Forest Track, Shing Mun Country Park
-
CEDD Contract No. YL/2019/02 - Hung Shui Kiu/Ha Tsuen New Development Area Advance Works Phase 2 - Site Formation & Engineering Infrastructure
-
HKHA Contract No. 20180218 - Construction of Public Housing Development at Tuen Mun Area 54 Sites 3 & 4 (East)
-
ArchSD Contract No. SS G506 - Construction of Station Square at Kai Tak (Phase 1)
-
HKHA Contract No. 20180305 - Construction of Subsidised Sale Flats Development at Tung Chung Area 54
-
ArchSD Contract No. SS H501 - Design & Construction of a Community Health Centre cum Social Welfare Facilities at Pak Wo Road, North District
-
WSD Contract No. 4/WSD/17 - Uprating of Tung Chung Fresh Water Supply System - Construction of Tung Chung No. 2 Fresh Water Service Reservoir
-
AFCD Contract No. R1/21-22 - Reconstruction of Tai Shing Stream Section of Shing Mun Forest Track, Shing Mun Country Park
-
ArchSD Contract No. SS E509 - Construction of Sports Centre, Community Hall and Football Pitches in Area 1, Tai Po
-
DSD Contract No. DC/2018/04 - Sewerage at Lei Yue Mun Village
-
HKHA Contract No. 20160503 - Construction of Public Rental Housing Development at Chung Nga Road East, Tai Po
-
AFCD Contract No. R1/20-21 - Reconstruction of Ho Pui Reservoir Section (Phase II) of Tai Lam Forest Track, Tai Lam Country Park
-
CEDD Contract No. NL/2017/01 - Infrastructure Works for Public Housing Development at Area 54, Tung Chung
-
HyD Contract No. HY/2016/05 - Footbridge Connecting Tsuen Wan Plaza, Skyline Plaza & Adjacent Landscaping Area
-
HKHA Contract No. 20170103 - Construction of Public Rental Housing Development at Wing Tai Road, Chai Wan
-
CEDD Contract No. NE/2015/01 - Tseung Kwan O - Lam Tin Tunnel - Main Tunnel & Associated Works
-
HKHA Contract No. 20150055 - Construction of Public Housing & Home Ownership Scheme Developments of Cheung Sha Wan Wholesale Food Market Site 3 & Site 5 Phases 1 & 2
-
HKHA Contract No. 20170162 - District Open Space at Anderson Road Site C2 Phase 1
-
CEDD Contract No. CV/2012/05 - Bathing Beach at Lung Mei, Tai Po
-
HyD Contract No. HY/2016/02 - Provision of Barrier-free Access Facilities for Highway Structures - Phase 3 Contract 9
-
HKHA Contract No. 20140269 - Construction of Home Ownership Scheme Development at Sheung Lok Street, Homantin
-
HKHA Contract No. 20150259 - Construction of Public Rental Housing Development at Lai Chi Kok Road - Tonkin Street Phases 1 & 2
-
AFCD Contract No. R1/18-19 - Reconstruction of Track & Pavement Improvement Works at Tai Po Kau Nature Reserve
-
HKHA Contract No. 20150592 - Foundation, Site Formation, Road & Drainage for Public Rental Housing Development at Queen's Hill Site 1, Fanling - Phases 1, 2 & 5
-
HKHA Contract No. 20150596 - Foundation, Site Formation, Road & Drainage for Subsidised Sale Flats Development at Queen's Hill Site 1, Fanling - Phase 3
-
MTR Contract No. C3840-13C: Tsim Sha Tsui Station Carnarvon Road Subway & Entrances Modification Works
-
HyD Contract No. HY/2013/01 - H.K.-Zhuhai-Macao Bridge H.K. Boundary Crossing Facilities - Passenger Clearance Building
-
ArchSD Contract No. SS D501 - Design & Construction of Redevelopment of Kwai Chung Hospital (Phase 1) at 3-15 Kwai Chung Hospital Road, New Territories
-
HyD Contract No. HY/2013/12 - Tuen Mun-Chek Lap Kok Link - Northern Connection Toll Plaza & Associated Works
-
AFCD Contract No. R2/18-19 - Reconstruction of Track & Pavement Improvement Works near Survey Section at Tai Lung Depot
-
HyD Contract No. HY/2013/03 - H.K.-Zhuhai-Macao Bridge H.K. Boundary Crossing Facilities - Vehicle Clearance Plazas & Ancillary Buildings & Facilities
-
CEDD Contract No. GE/2014/03 - Landslip Prevention & Mitigation Programme, 2014, Package K, Landslip Prevention & Mitigation Works in H.K. Island, N.T. & Outlying Islands
-
House Development at 72 Repulse Bay Road, Repulse Bay for First Group
-
…etc.