top of page

Thoron
(Hong Kong)
Limited  科諾

Epigrip CW

Anti-skid surface coating

Epigrip CW is a two component resin extended epoxy high build coating characterised by its inbuilt flexibility, excellent adhesion and resistance to water and a wide range of chemicals.  It provides a heavy duty anti-skid system by the incorporation of an aggregate into the wet film and is suitable for use on asphalt and concrete carriageways.

 

Advantages: -

  • No primer required.

  • Excellent bond strength.

  • Good chemical and abrasion resistance.

  • Inbuilt flexibility.

 

Applications: -

  • Anti-skid surfacing system for carriageways, bridge decks, platforms, etc.

  • Wearing coat on multi-storey car parks.

  • Safety flooring system.

 

Technical information: -

  • Color: black

  • Pot life at 20°C: 40 minutes

  • Foot traffic: min 4 hours at 20°C

  • Light traffic: min 12 hours at 20°C

  • Full Traffic: min 16 hours at 20°C

 

Epigrip CW is manufactured in the U.K. and is supplied in 25kg pack.

We no longer supply Epigrip CW.  For a moderately priced product with the same performance, please refer to X-Tech DuraDeck ET.​​

Here comes the list of job reference: -

  • Water Supplies Department (WSD) Contract No. 13/WSD/19 - Construction of Pressure Management & District Metering Installations under Water Intelligent Network - Remaining Works

  • Highways Department (HyD) Contract No. HY/2020/09 - Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways & Subways - Package 4 Contract 2

  • Maintenance Work at Lower Wong Tai Sin (1) Estate for Hong Kong Housing Authority (HKHA)

  • HyD Contract No. HY/2021/16 - Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways & Subways - Package 5 Contract 2

  • Civil Engineering and Development Department (CEDD) Contract No. ED/2022/01 - Infrastructure Works for Developments at Kwun Tong Action Area

  • HyD Contract No. 12/HY/2019 - Highways Department Term Contract (Management & Maintenance of Roads in Kowloon West excluding Expressways & High Speed Roads 2020 - 2026)

  • Kam Sheung Road Station Package One Property Development at Lot 1040 in DD 103, Yuen Long for MTR Corporation (MTR), Sino Land, China Overseas & K. Wah

  • HyD Contract No. HY/2019/05 - Footbridge near MTR Kowloon Bay Station Exit B

  • WSD Contract No. 10/WSD/14 - Construction of Pressure Management & District Metering Installations in Aberdeen, Central, Eastern, Western, Sai Wan, Red Hill, Kowloon West, Tsuen Wan, Sai Kung & Tuen Mun Major Fresh Water Supply Zones

  • Hong Kong Science & Technology Parks Corporation (HKSTP) Contract No. PD/WC/263 - Main Works Contract for MARS Manufacturing Centre at Tai Po Industrial Estate

  • Drainage Services Department (DSD) Contract No. DC/2019/13 - Tolo Harbour Sewerage of Unsewered Areas Stage 2, Phase 2

  • CEDD Contract No. ND/2019/04 - Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shek Wu San Tsuen North to Lung Yeuk Tau)

  • Lam Tsuen Farmland for City University of Hong Kong

  • Home Affairs Department (HAD) Contract No. ST7 of 2020 - Improvement of Footpath from Tai Che Village to Fa Sum Hang Village, Sha Tin

  • External Communication Station at RBL 1158, Chung Hom Kok for SUNeVision

  • HyD Contract No. 01/HY/2014 - Highways Department Term Contract (Management & Maintenance of Roads in New Territories West excluding High Speed Roads 2015 - 2021)

  • CEDD Contract No. CV/2015/02 - Provision of Universal Access Facilities for Highway Structures - Package 2 Contract 2

  • CEDD Contract No. NE/2015/01 - Tseung Kwan O-Lam Tin Tunnel - Main Tunnel & Associated Works

  • HyD Contract No. HY/2014/06 - Provision of Barrier-free Access Facilities for Highway Structures - Phase 3 Contract 5

  • Architectural Services Department (ArchSD) Contract No. PI G517 - Piling & Advance Works for Swimming Pool Complex & Open Space in Area 107, Tin Shui Wai

  • Residential Development at NKIL 6514, Development Areas 2 & 3, Kwun Tong Town Centre (Grand Central) for Urban Renewal Authority (URA), Sino Land & Chinese Estates

  • CEDD Contract No. CV/2015/08 - Provision of Universal Access Facilities for Highway Structures - Package 1 Contract 3

  • Happy Valley Clubhouse Extension at 25 Shan Kwong Road, Happy Valley for Hong Kong Jockey Club (HKJC)

  • DSD Contract No. DC/2011/04 - Reconstruction, Improvement & Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate

  • CEDD Contract No. KL/2011/01 - Kai Tak Development - Reconstruction & Upgrading of Kai Tak Nullah

  • MTR Shatin to Central Link Contract No. 1109: Sung Wong Toi & To Kwa Wan Stations and Tunnels

  • MTR South Island Line (East) Contract No. 903: Ocean Park Station, Wong Chuk Hang Station, Viaducts & Aberdeen Channel Bridge

  • MTR Shatin to Central Link Contract No. 1129: Advance Works for NSL

  • HyD Contract No. HY/2008/11 - Reconstruction & Improvement of Tuen Mun Road - Sam Shing Hui Section

  • HyD Contract No. HY/2009/03 - Design & Build of Traffic Improvements to Tuen Mun Road Town Centre Section

  • CEDD Contract No. IS/2010/01 - Construction of Riverwall at Yat Chung, Tai O & Ancillary Improvement Works

  • DSD Contract No. DC/2011/05 - Lam Tsuen Valley Sewerage - Village Sewerage, Stage 1

  • HyD Contract No. HY/2008/09 - Widening of Tolo Highway/Fanling Highway btw. Island House Interchange & Fanling (Stage 1 - between Island House Interchange & Ma Wo)

  • WSD Contract No. 8/WSD/08 - Replacement & Rehabilitation of Water Mains, Stage 3 Mains in East Kowloon (Package B)

  • DSD Contract No. DC/2009/07 - North District & Tolo Harbour Regional Sewerage - Upgrading of Trunk Sewers at Ma Liu Shui, Tai Po & North District

  • MTR West Island Line Contract No. 703: Sheung Wan-to-Sai Ying Pun Tunnel Construction

  • MTR South Island Line (East) Contract No. 907: Wong Chuk Hang Depot Site Formation and Piling

  • Hennessy Centre Redevelopment at 500 Hennessy Road, Causeway Bay (Hysan Place) for Hysan

  • MTR Express Rail Link Contract No. 811B: West Kowloon Terminus Approach Tunnel (South)

  • WSD Contract No. 12/WSD/07 - Construction of Sha Tin Seafront No. 2 Salt Water Pumping Station and Associated Mainlaying

  • Centennial Campus of the University of Hong Kong

  • WSD Contract No. 18/WSD/08 - Replacement & Rehabilitation of Water Mains, Stage 3 - Mains on H.K. Island South & Outlying Islands

  • DSD Contract No. DC/2007/05 - Drainage Improvement in East Kowloon - Package C & Remaining Works

  • CEDD Contract No. CV/2006/01 - Ping Ha Road Improvement Works (Ha Tsuen Section)

  • WSD Contract No. 24/WSD/06 - Replacement & Rehabilitation of Water Mains, Stage 2, Mains in Sai Kung

  • DSD Contract No. DC/2006/17 - North District Sewerage Stage 1 Phase 2B

  • CLP Substation at 12 Kom Tsun Street, Lai Chi Kok

  • Kowloon-Canton Railway Corporation (KCRC) Kowloon Southern Link Contract No. KDB400 - Tunnels - Yau Ma Tei Ventilation Building to Nam Cheong Overrun

  • HyD Contract No. HY/2005/03 - Public Transport Interchange at Sai Kung Town North

  • WSD Contract No. 3/WSD/02 - Replacement & Rehabilitation of Water Mains, Stage 1 Phase 1 - Mains in H.K. Island

  • DSD Contract No. DC/2003/06 - West Kowloon Drainage Improvement Stage 2 & Stage 3 - Remaining Works

  • Renovation Works for the CDW Building, 388 Castle Peak Road, Tsuen Wan for HKR International

  • URA Project K2 (Site A & B) - Langham Place & Langham Hotel at KIL 11099, 8 Argyle Street, 555 Shanghai Street, Kowloon - EVA Ramp & Loading Docks

  • DSD Contract No. DC/99/05 - West Kowloon Drainage Improvement - Stage 2 Phase 2 - Kai Tak Transfer Scheme

  • HyD Contract No. 07/HY/2000 - Highways Department Term Contract (Northern & Western Districts of H.K. Island 2001-2004)

  • WSD Contract No. 1/WSD/00(5) - Term Contract for Waterworks District 5 - Mainland North East (Contract Period 1.9.2000 - 31.8.2003)

  • HyD Contract No. 18/HY/98 - Term Contract for Northern & Western Districts of H.K. Island

  • HKHA Contract No. MT1999148 - Anti-skid Road Dressing to Ground Floor of Multi-storey Carpark in Wang Tau Hom Estate

  • HKHA Contract No. 115 of 1998 - Advanced Civil Engineering Works for Urban Housing Estates

  • HyD Contract No. HY/96/09 - Reconstruction of Lockhart Road Stage II - Section between Canal Road East & Arsenal Street

  • DSD Contract No. DC/95/05 - Central, Western & Wanchai West Trunk Sewers

  • HyD Contract No. HY/93/38 - Ting Kau Bridge & Approach Viaduct

  • ....etc.....

© 2017 by Thoron (Hong Kong) Ltd.

  • Thoron Hong Kong
  • Linkedin
bottom of page