THORON
(HONG KONG)
LIMITED 科諾
X-Shield BugFill is a high build thixotropic epoxy resin for filling bug holes (blow holes) in concrete, and surface imperfections in steel, prior to the application of epoxy, polyurethane and polyurea coatings. It is also used as a general purpose adhesive, liner and bedding compound.
-
Non slump
-
Long Pot life
-
Primerless
-
Can be used in contact with potable water
-
Resistant to wide range of chemicals
-
Can be used in immersed conditions
X-Shield BugFill is made in United Arab Emirates and is supplied in 5kg pack. The product is always ex-stock Hong Kong.
It can be the epoxy for use with Greenstreak PVC Retrofit Waterstop for sealing joints where new construction meets an existing structure.
Below is the list of job reference of X-Shield BugFill in Hong Kong: -
-
Drainage Services Department (DSD) Contract No. DC/2022/06 - Village Sewerage in Muk Wu, Lo Wai, Chuen Lung & Kau Wa Keng Old Village
-
Highways Department (HyD) Contract No. HY/2022/08 - Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways & Subways - Package 6 Contract 2
-
Environmental Protection Department (EPD) Contract No. EP/SP/66/12 - Integrated Waste Management Facilities Phase 1
-
Drainage Services Department (DSD Contract No. DC/2019/13 - Tolo Harbour Sewerage of Unsewered Areas Stage 2, Phase 2
-
HyD Contract No. HY/2018/08 - Central Kowloon Route - Central Tunnel
-
HyD Contract No. HY/2014/07 - Central Kowloon Route - Kai Tak West
-
HyD Contract No. HY/2014/20 - Central Kowloon Route - Yau Ma Tei West
-
HyD Contract No. HY/2019/13 - Central Kowloon Route - Buildings, Electrical & Mechanical Works
-
DSD Contract No. DC/2019/10 - Yuen Long Effluent Polishing Plant - Main Works for Stage 1
-
HyD Contract No. HY/2014/08 - Central Kowloon Route - Yau Ma Tei East
-
Water Supplies Department (WSD) Contract No. 2/WSD/20 - Construction of Sheung Wong Yi Au No. 3 Fresh Water Service Reservoir
-
HyD Contract No. HY/2019/21 - Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways & Subways - Package 3 Contract 2
-
DSD Contract No. DC/2018/07 - Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sewage Treatment Facilities
-
Civil Engineering & Development Department (CEDD) Contract No. ED/2018/05 - Kai Tak Development - Stage 5B Infrastructure Works at the Former North Apron Area
-
HyD Contract No. HY/2020/23 - Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways & Subways - Package 6 Contract 1
-
CEDD Contract No. YL/2021/04 - Site Formation & Infrastructure Works for Yuen Long South First Phase Development - Contract 2
-
CEDD Contract No. YL/2020/02 - Development of Lok Ma Chau Loop: Main Works Package 1 - Contract 2 Western Connection Road Phase 2, Connection Roads to Fanling / San Tin Highway & Direct Road Link Phase 1
-
Galaxy Resort & Casino, Phase 4 Lot 4, New Integrated Resort Development at Cotai City, Macau
-
CEDD Contract No. ED/2020/02 - Development of Anderson Road Quarry Site - Infrastructure, Greening & Landscape Works
-
Airport Authority Hong Kong (AAHK) Contract No. 3302 - Three Runway System Project - Eastern Vehicular Tunnel Advance Works
-
AAHK Contract No. 3303 - Three Runway System Project - Third Runway & Associated Works
-
DSD Contract No. DC/2017/05 - Enhancement Works for Kwun Tong Sewage Pumping Station
-
WSD Contract No. 13/WSD/17 - Design, Build & Operate First Stage of Tseung Kwan O Desalination Plant
-
DSD Contract No. DC/2018/06 - Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sludge Treatment Facilities & 132kV Primary Substation
-
Hong Kong Housing Authority (HKHA) Contract No. 20180311 - Construction of Public Housing Development at Tsing Hung Road, Tsing Yi
-
MTR Corporation (MTR) Shatin to Central Link Contract No. 1121: NSL Cross Harbour Tunnels
-
DSD Contract No. DC/2013/10 - Design, Build & Operate San Wai Sewage Treatment Works - Phase 1
-
WSD Contract No. 4/WSD/17 - Uprating of Tung Chung Fresh Water Supply System - Construction of Tung Chung No. 2 Fresh Water Service Reservoir
-
CEDD Contract No. CV/2016/06 - Widening of the Footbridge Connecting Pak Wo Road to MTR Fanling Station & its Associated Works
-
HKHA Contract No. 20150364 - Construction of Public Rental Housing Development at Choi Yuen Road Sites 3 & 4, Sheung Shui
-
HyD Contract No. HY/2018/09 - Lift & Pedestrian Walkway System between Tai Wo Hau Road & Wo Tong Tsui Street, Kwai Chung
-
Residential Development at TPTL 221, 8 Shan Tong Road, Lai Chi Shan, Tai Po (The Regent) for China Overseas
-
HyD Contract No. HY/2015/06 - Provision of Barrier-free Access Facilities for Highway Structures - Phase 3 Contract 8
-
DSD Contract No. DC/2013/01 - Tolo Harbour Sewerage of Unsewered Areas Stage 2 - Phase 1 & Sewerage in Nam Wa Po & Wai Tau
-
DSD Contract No. DC/2012/02 - Upgrading of Mui Wo Sewage Treatment Works & Village Sewerage at Wang Tong & Yue Kwong Chuen
-
HyD Contract No. HY/2013/03 - H.K.-Zhuhai-Macao Bridge H.K. Boundary Crossing Facilities - Vehicle Clearance Plazas & Ancillary Buildings and Facilities
-
HKHA Contract No. 20140288 - Construction of Public Rental Housing Development at So Uk Estate Phase 2
-
CEDD Contract No. KL/2016/01 - West Kowloon Reclamation - Main Works (Remainder) - Footbridge at J/O Sham Mong Road & Tonkin Street West in Sham Shui Po
-
WSD Contract No. 3/WSD/15 - In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) - Advance Works
-
AAHK Contract No. P581 - H.K. Int’l Airport - East Hall Expansion Works
-
DSD Contract No. DC/2011/04 - Reconstruction, Improvement & Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate
-
HyD Contract No. HY/2011/03 - H.K.-Zhuhai-Macao Bridge H.K. Link Road - Section between Scenic Hill & H.K. Boundary Crossing Facilities
-
HyD Contract No. HY/2013/01 - H.K.-Zhuhai-Macao Bridge H.K. Boundary Crossing Facilities - Passenger Clearance Building
-
WSD Contract No. 15/WSD/10 - Expansion of Tai Po Water Treatment Works & Ancillary Raw Water & Fresh Water Transfer Facilities - Design & Build of New Stream II
-
CEDD ontract No. CV/2015/02 - Provision of Universal Access Facilities for Highway Structures - Package 2 Contract 2
-
MTR Shatin to Central Link Contract No. 1106: Diamond Hill Station & Diamond Hill Stabling Sidings
-
HyD Contract No. HY/2012/08 - Tuen Mun-Chek Lap Kok Link - Northern Connection Sub-Sea Tunnel Section
-
CEDD Contract No. CV/2014/02 - Provision of Universal Access Facilities for Highway Structures - Package 2 Contract 1
-
DSD Contract No. DC/2009/10 - HATS Stage 2A - Upgrading Works at Stonecutters Island Sewage Treatment Works - Main Pumping Station, Sedimentation Tanks & Ancillary Facilities
-
CEDD Contract No. HK/2012/08 - Wan Chai Development Phase II - Central-Wan Chai Bypass at Wan Chai West
-
HyD Contract No. HY/2014/12 - Provision of Barrier-free Access Facilities for Highway Structures - Phase 3 Contract 6
-
MTR Tai Wai Station Property Development at STTL 520 (The Pavilia Farm) by New World
-
MTR Shatin to Central Link Contract No. 1123: Exhibition Station & Western Approach Tunnel
-
DSD Contract No. DC/2009/18 - HATS Stage 2A - Upgrading Works at Stonecutters Island Sewage Treatment Works - Effluent Tunnel & Disinfection Facilities
-
MTR Express Rail Link Contract No. 810B: West Kowloon Terminus Station South
-
WSD Contract No. 4/WSD/11 - Construction of Butterfly Valley Fresh Water Primary Service Reservoir Extension & Associated Mainlaying
-
MTR Express Rail Link Contract No. 824: Ngau Tam Mei to Tai Kong Po Tunnels
-
WSD Contract No. 11/WSD/09 - Supply & Installation of Mechanical & Electrical Equipment for Salt Water Supply for North West New Territories & Yuen Long
-
DSD Contract No. DC/2011/05 - Lam Tsuen Valley Sewerage - Village Sewerage, Stage 1
-
DSD Contract No. DC/2009/23 - HATS Stage 2A - Upgrading of Preliminary Treatment Works at North Point, Wan Chai East & Central
-
CEDD Contract No. CV/2012/02 - Construction of Sewage Pumping Station near Tsz Tin Road & Associated Sewerage Works in Area 54, Tuen Mun
-
WSD Contract No. 13/WSD/11 - Replacement & Rehabilitation of Water Mains, Stage 4 Phase 2 - Mains in East Kowloon, Wong Tai Sin, Kowloon City & Kwun Tong
-
WSD Contract No. 8/WSD/08 - Replacement & Rehabilitation of Water Mains, Stage 3 - Mains on H.K. Island South & Outlying Islands
-
DSD Contract No. DC/2012/06 - Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen & West of Sai Kung Town
-
DSD Contract No. DC/2012/04 - Sewerage in Kau Lung Hang Lo Wai, Kau Lung Hang San Wai & Tai Hang
-
WSD Contract No. 14/WSD/10 - Replacement & Rehabilitation of Water Mains, Stage 4 Phase 1 - Mains in East Kowloon
-
MTR Contract No. C6598-13C Q023973: Relocation & Reprovision of Sea Water Cooling Mains for Elements
-
DSD Contract No. DE/2010/01 - Supply & Installation of E&M Equipment for Shatin Main Sewage Pumping Station
-
WSD Contract No. 1/WSD/11(K) - Term Contract for Waterworks - District K - Kowloon (1.9.2011-31.8.2014)
-
MTR West Island Line Contract No. 704: Sai Ying Pun & Hong Kong University Station, & Sai Ying Pun to Kennedy Town Tunnel Construction
-
MTR West Island Line Contract No. 705: Kennedy Town Station & Overrun Tunnel Construction
-
DSD Contract No. DC/2008/12 - Sewage Interception Scheme in Kowloon City - Pumping Stations, Rising Mains & Trunk Sewers
-
...etc.
X-Shield BugFill
Epoxy bug hole filler, skim coat and general purpose adhesive